Field Definitions: PM Change Orders Form
The following is a list of field descriptions for the PM Change Orders form. Many of the descriptions include links to other topics that provide additional information about or related to the topic.
Project
Specify the project (from PM Projects) for which you are setting up/editing this change order.
If you enter a project with a closed status (hard or soft), the status displays in red to the right of the project description. You will only be able to add or modify change orders (pending or approved) for the project if you allow posting to hard- and/or soft-closed jobs (flags in JC Company Parameters checked).
PCO Type
Enter the pending change order type or press F4 to select a type from a list.
PCO types are created and maintained using the PM Document Types form.
PCO
Enter a number for this change order, up to 10 characters, or enter ‘+’ to auto-generate the next sequential number available. Numbers will be generated based on the ‘Auto Generate Pending Change Orders Using’ option designated in PM Projects (Project or Project/Type). If the option is set to ‘Project’, the system will generate the next sequential number based on all PCO’s for the project. If the option is set to ‘Project and Type’, the system will generate the next sequential number based on all PCO’s having the same document type (e.g. all PCO’s for the project with a document type of ‘FO’).
If you are using both numeric and alphanumeric numbers, the auto-generate process will ignore alphanumeric numbers when determining the next number to assign.
If you do not allow posting to hard- and/or soft-closed jobs (flags in JC Company Parameters unchecked), you can only view existing pending change orders; you cannot not add new pending change orders or modify existing ones (all inputs will be disabled).
PCO: Description
PCO: Date 1-3
The column headings for these three date fields are determined by what was entered in the Pending Change Order Date fields in PM Document Types for the selected change order type. Additionally, each column will only show if the Show in Grid option is checked for that column.
Date Shortcuts
T or t |
Set the date to the current date. |
MMDD Four digit month and day |
Enter a four digit month and date (MMDD) and the system will automatically add the current year. |
+ |
The system will automatically set the date to tomorrow. |
+5 |
The system will automatically set the date to 5 days in the future. You can actually enter any value after the +, for example you can enter +7 to set the date to next week. |
- |
The system will automatically set the date to the previous day. |
-5 |
The system will automatically set the date to 5 days in the past. Just like with +, you can enter any value after the -, for example you can enter -7 to set the date to the previous week. |
Pending Status
This display-only field shows the current system-assigned status for each change order. Status will be assigned as follows:
0-Pending - All items on the change order have a beginning or intermediate status and none have been approved. Pending change orders with no items will also be assigned this status.
1-Partial - At least one item on this change order has a beginning or intermediate status and has not been approved.
2-Approved - All items on this change order have been approved.
3-Final - All items on this change order are approved or final (not approved, but assigned a 'final' type status code, such as 'Rejected' or 'Canceled').
Details
Enter detail information about the pending change order. Double click in the field to open the Grid Notes form, which gives you more space to enter the information.
Add a Standard Note
Standard notes allow you to insert frequently used text into some fields in the application. This text is created and maintained using the HQ Standard Note form.
To insert a standard note into the field, right click the mouse while focus is in the field and select Standard Notes from the shortcut menu, which opens the Standard Note Copy window. Then enter the standard note to copy (or select from F4 lookup) and click OK. The system inserts the selected note into the field.
Pending Tab - Impact Estimate, SL, PO, and Contract Boxes
The Impact Estimate, Impact SL, Impact PO, and Impact Contract boxes on the Pending tab are disabled on this form.
If you want to change the values in these fields you must use the Info tab in the upper portion of PM Pending Change Orders .
The selections in these fields will default based on the document type selected in the PCO Type field. Use the PM Interface form to change how these fields will default.
Pricing Method
Use this field to select the pricing method of the pending change order. The selection in this field determines which fields will display on the Estimate / Purchase Details tab in the lower portion of the PM Pending Change Orders form.
This field will default based on the document type selected in the PCO Type field. Use the PM Document Types field to change how this field defaults.
ACO
Enter the approved change order number or enter ‘+’ to auto-generate the next sequential number available.
If you are using both numeric and alphanumeric numbers, the auto-generate process will ignore alphanumeric numbers when determining the next number to assign.
If you do not allow posting to hard- and/or soft-closed jobs, you can only view existing approved change orders - you cannot add new approved change orders or modify existing ones. You can disallow posting to hard and soft closed jobs using JC Company Parameters .
ACO: Description
New Complete Date
Enter the new contract completion date. This entry will update PM Contracts and will print on the Approved Change Order form.
Date Shortcuts
T or t |
Set the date to the current date. |
MMDD Four digit month and day |
Enter a four digit month and date (MMDD) and the system will automatically add the current year. |
+ |
The system will automatically set the date to tomorrow. |
+5 |
The system will automatically set the date to 5 days in the future. You can actually enter any value after the +, for example you can enter +7 to set the date to next week. |
- |
The system will automatically set the date to the previous day. |
-5 |
The system will automatically set the date to 5 days in the past. Just like with +, you can enter any value after the -, for example you can enter -7 to set the date to the previous week. |
ACO Sequence
Enter the sequence number for this approved change order. This field initially defaults the next highest available number.
The sequence number determines the amount to be included on the Approved Change Order form in the line “The net change by previously authorized Change Orders was…”. Any change orders with a sequence number lower than the change order being printed will be included on this line.
Bill Group
ACO: Internal/External
I-Internal - Use this option to identify this approved change order as one that will only affect the contractor’s internal budget.
E-External - Use this option to identify this approved change order as one that will affect the owner’s schedule of values.
This flag is updated to Job Cost during the PM interface. However, it is not used by any other PM program or by any standard reports. It is available for use in customer-created reports.
Date Sent
Enter the date the approved change order was sent.
Date Shortcuts
T or t |
Set the date to the current date. |
MMDD Four digit month and day |
Enter a four digit month and date (MMDD) and the system will automatically add the current year. |
+ |
The system will automatically set the date to tomorrow. |
+5 |
The system will automatically set the date to 5 days in the future. You can actually enter any value after the +, for example you can enter +7 to set the date to next week. |
- |
The system will automatically set the date to the previous day. |
-5 |
The system will automatically set the date to 5 days in the past. Just like with +, you can enter any value after the -, for example you can enter -7 to set the date to the previous week. |
Date Required
Enter the date the change order should be complete. This field initially defaults based on the Date Sent on the change order and the Default Standard Days Due defined for the project on the Info tab of PM Projects.
Date Shortcuts
T or t |
Set the date to the current date. |
MMDD Four digit month and day |
Enter a four digit month and date (MMDD) and the system will automatically add the current year. |
+ |
The system will automatically set the date to tomorrow. |
+5 |
The system will automatically set the date to 5 days in the future. You can actually enter any value after the +, for example you can enter +7 to set the date to next week. |
- |
The system will automatically set the date to the previous day. |
-5 |
The system will automatically set the date to 5 days in the past. Just like with +, you can enter any value after the -, for example you can enter -7 to set the date to the previous week. |
Date Received
Enter the date the approval of the change order was received.
Date shortcuts
T or t |
Set the date to the current date. |
MMDD Four digit month and day |
Enter a four digit month and date (MMDD) and the system will automatically add the current year. |
+ |
The system will automatically set the date to tomorrow. |
+5 |
The system will automatically set the date to 5 days in the future. You can actually enter any value after the +, for example you can enter +7 to set the date to next week. |
- |
The system will automatically set the date to the previous day. |
-5 |
The system will automatically set the date to 5 days in the past. Just like with +, you can enter any value after the -, for example you can enter -7 to set the date to the previous week. |
Approval Date
Specify the actual approval date of the change order.
Date Shortcuts
T or t |
Set the date to the current date. |
MMDD Four digit month and day |
Enter a four digit month and date (MMDD) and the system will automatically add the current year. |
+ |
The system will automatically set the date to tomorrow. |
+5 |
The system will automatically set the date to 5 days in the future. You can actually enter any value after the +, for example you can enter +7 to set the date to next week. |
- |
The system will automatically set the date to the previous day. |
-5 |
The system will automatically set the date to 5 days in the past. Just like with +, you can enter any value after the -, for example you can enter -7 to set the date to the previous week. |