Synchronize existing and imported data
- Open a job in the Manage Earthwork Estimates screen.
- Select the Takeoff tab, if it is not already active.
-
In the Active Layer field on the toolbar, click
to select Existing.
- Make sure that two different reference points have been created in the existing layer. See Digitize Spot Elevations and Reference Points for more information.
-
In the Active Layer field on the toolbar, click
to select Proposed.
- Make sure that two different reference points have been created in the proposed layer.
- Click in the All Tasks pane.
-
In the Existing Layer section, in the Reference Point 1 and Reference Point 2 fields, click
to select the reference points in the existing layer to use in the synchronization.
-
In the Proposed Layer section, in the Reference Point 1 and Reference Point 2 fields, click
to select the reference points within the proposed layer that correspond to those selected for the existing layer.
- Select the option for the layer that contains the correct World Coordinates.
- Click OK.