PC Bid Swing
You can use the PC Bid Swing report to show how the estimating department is performing when compared to their primary competitors in shared markets. To access this report, select .
Each project is broken down by bid package and can be grouped any two of the following options: Prime/Sub, Project Type, Estimator, or Department. Additional sorting can be performed using either Bid Date or Bid Status.
|
Parameters | |
|---|---|
|
Company |
Accept the default, or press F4 to select a company. |
|
Enter Department |
Click the Field Lookup button or press F4 to select the department or leave blank for all. |
|
Beginning Bid Date |
Enter beginning bid or leave blank for all. |
|
Ending Bid Date |
Enter ending bid or leave blank for all. |
|
Project Type |
Click the Field Lookup button or press F4 to select the project type or leave blank for all. |
|
Bid Status |
Click the Field Lookup button or press F4 to select the bid status or leave blank for all. |
|
(P)rime/(S)ub (Blank for Both) |
Enter P, S or leave blank for all. |
|
Competitor Name |
Enter competitor name. |
|
Bid Awarded Status (Y)es, (N)o or blank for all |
Enter Y, N or leave blank for all. |
|
Group 1 |
Click the Field Lookup button or press F4 to select the static bid analysis group for group 1 or leave blank for all. |
|
Group 2 |
Click the Field Lookup button or press F4 to select the static bid analysis group for group 2 or leave blank for all. |
|
Optional Sort Order by (B)id Date or (S)tatus |
Enter B, S, or leave blank. |