Pasar al contenido principal

Reorder the workflow steps

Modified: 11 Jul 2026 ProjectSight

In the grid, select the left side of the step and drag it to a different position.

Nota: The start step is always at the top of the grid, and the finish steps are always at the bottom of the grid.
Enviar

Table of Contents