Pasar al contenido principal

360 viewer

Modified: 11 Jul 2026 ProjectSight Project Management Help

Compare work site photos or videos, view asset information, and track structural changes or historical progression over time.

Nota: The ProjectSight 360 Capture module is available as an add-on for your account.

With the 360 Viewer, you can compare work site photos or videos, view information about the photo or video, and see the history of the work done. See how key areas of interest change over time.

  1. Select Drawings from the project menu.
  2. Abra el plano.
  3. Open a photo or station in the drawing and select the photo or video preview to open the 360 Viewer.
Nota: You may see some icons that are not available for use. These are for future module enhancements.

Once you open the video in the 360 Viewer, you can move from station to station. The viewer displays the next closest station.

  • Select the station dots.
  • Use the left and right arrows in the Media toolbar.
  • Use the far left and far right arrows to move to the first or last station.
  • Select a station on the mini-map in the upper right corner.
  • Click on the photo and drag the mouse to change the photo orientation. If you are doing a split-screen comparison, right click (PC) or click with two fingers (Mac) and select Reset Sync Differences to reset the photos to the same orientation.

Compare view

Use CompareCompare icon in the lower right corner to see a side-by-side split screen of a photo or station. See how the space has changed over time and the progression of work done.

Select Close CompareClose Compare icon in the lower right of the left pane to return to a single view, or select the X in either pane to close that pane.

Navigation features

Use the sync to determine the behavior of each pane in the comparison.

  • Sync locked Sync locked icon - both panes move when the sync is locked.
  • Sync unlocked Sync unlocked icon - the selected pane moves when the sync is unlocked.
Navigate the comparison

If you navigate and the station does not move, it means ProjectSight couldn't compare the closest selected station because it didn't match the current one. Use the mini-map to move to a new station.

ProjectSight displays the same area, so the stations photos may not be exactly aligned.

  • Use the left and right date arrows to see the same station on the next date.
  • Use the Media toolbar left and right arrows to see the next station on the same date.
  • Right click (PC) or click with two fingers (Mac) and select Reset Sync Differences to reset the photos to the same orientation.

BCF topics

Use BCF topics to share information with Trimble Connect.

A 360 photo with BCF issues

  • Select the Add Issue button at the top of the photo to add an issue.
  • Select the Issues button in the left pane to open the topics.
  • Select an existing issue to see its details.

For help with BCF topics, please see BCF Topics in the Trimble Connect documentation.

Enviar

Table of Contents