Pasar al contenido principal

Switch to ball-in-court workflows

Modified: 11 Jul 2026 ProjectSight

You can switch to ball-in-court workflows.

To switch to ball-in-court workflows:
  1. Open the record settings.
  2. Seleccione el tipo de registro.
    Nota: To switch the workflow setting at the project level, make sure the Workflow settings page is unlocked. To unlock the page, select locked icon on the navigation toolbar.
  3. In the Ball-in-court workflows section, select Upgrade now.
  4. In the confirmation dialog, select Upgrade.
Enviar

Table of Contents