November 22, 2025 Version 2025.20

Modified: 11 Jul 2026 ProjectSight What's New

A summary of the feature enhancements and resolved issues for ProjectSight Web from November 22, 2025.

Go projects - Daily reports

Versión Go

Go projects now include daily reports so that you can track the equipment, daily activity of the crews, and weather conditions on your job site.

Daily reports module in a Go project

If you're the account owner of a free subscription, and you want to upgrade it to a Go subscription, you can:

Drawings - Annotation labels

In the drawing viewer, you can move the annotation label without moving the annotation itself. When you download the drawing, the annotation label remains in the new location.

Moving an annotation label

ERP integration - PCO items

Enterprise version

To ensure that each vertical markup is unique in a PCO, a letter is appended automatically to its item number.

Items numbers for vertical markups

Resolved issues

  • In the PDF viewer, files are downloaded successfully. (CN 000000556 / PS-55804)
  • In the Detailed with Links report for transmittals, Trimble Connect file links open the correct files. (CN 000002970 / PS-62517)
  • In various right-side panels, the Save buttons are displayed consistently. (CN 000003082 / PS-63277)
  • In the budget, the tooltip for the Projected costs column displays the correct calculation. (CN 000003087 / PS-63290)
  • When you drag multiple drawings to the Uploading a file dialog in a drawing set, you can select which drawing to use in the Title block processing dialog. (CN 000003107 / PS-63421)
  • In checklist items, the navigation arrows show the previous and next checklist items. (CN 000003123 / PS-63521)