Skip to main content

How to: Generate a panel schedule and manage panels in AutoCAD

Modified: 22 May 2026 Stabicad
Not version-specific
Stabicad
Context A panel schedule clearly indicates what is in a distribution board, including the number of circuits, protections, sockets, and fixtures with their corresponding power. In Stabicad, you can generate this schedule automatically based on your floor plan drawing.
Workflow: Read installation data and generate schedule
  1. In the Stabicad Lighting palette, go to the Tools tab and click on Manage installation.
  2. In the Read Installation Data window, choose whether to read data from the Current drawing or Other file(s), and click OK.
  3. The Installation Overview will now open. Expand the tree structure (via the plus sign) to view the panels (e.g., LK1) and underlying circuits.
  4. Select the distribution board (the panel) to fill in the properties, such as the description, Spare capacity (e.g., 20%), and the number of Protections.
  5. Optional: To adjust the diversity factor, select the desired categories at the bottom under Total number of symbols on panel, right-click and choose Modify. Enter the new percentage (e.g., 60).
  6. Set the schedule to Draw or Draw & Close to actually generate the panel schedule next to your floor plan in the drawing.
Submit