Context Sometimes it is necessary to generate a panel schedule from several already existing panel schedules. For example, when the main panel of one or more sub-panels needs to be drawn, and these sub-panels have already been drawn with extra manually added symbols and adjusted diversity factors.
This guide describes how to import and merge these schedules. We assume the following situation: The main panel HKL has two circuits K1 and K2. Sub-panel LK1 is connected to circuit K1, and sub-panel LK2 is connected to circuit K2. The panel schedules for LK1 and LK2 have already been drawn.
Workflow: Importing and merging schedules
- Create a new drawing in StabiBASE for the main panel's schedule (e.g.,
Panel schedule HKL.dwg) and open it in AutoCAD. - Run the Manage installation function and in the Read Installation Data dialog, choose only the option 'Current Drawing'.
- Click [Import] in the installation overview dialog, ensure everything is checked, and click [Select Drawing].
- Select the first existing panel schedule (e.g.,
Panel schedule LK1.dwg) and click [OK]. Click [OK] on the next prompt as well. - Rename the panels that have "_1" added to them by removing the "_1" from the panel name. (Note: the power values are not correct yet, this will be fixed later).
- Click [Save].
- Repeat steps 2 to 6 (skipping step 5) to import the next panel schedule (e.g.,
Panel schedule LK2.dwg). - Delete circuit K2 from the already existing panel HKL.
- Drag circuit K2 from the newly imported panel HKL_1 to panel HKL.
- Rename the sub-panel on K2 by removing "_1" from the panel name.
- Delete the newly imported panel HKL_1 and click [Save].
- Repeat this process until all panel schedules are imported, then click [OK].
Workflow: Updating power and drawing the schedule 13. Run the Manage Installation function again. 14. In the Read Installation Data dialog, now choose BOTH options: 'Current Drawing' AND 'Other Files'. 15. Select the original installation drawing(s) (e.g.,
Installationdrawing.dwg) and click [OK]. 16. Click [OK] again. The correct power values have now been added to the circuits. 17. In the Installation Overview dialog, go to [Draw] -> Panel schedule. The complete panel schedule of the main panel HKL will now be drawn with the correct (total) power values.