Projected Cost Report - Field Descriptions
Use the table below for reference when completing fields on this screen.
Field |
Description |
|---|---|
Selections |
|
Batch |
The operator's login initials default as the batch code, but you can enter a new one. |
Job |
Enter the job number to include on this report. You must specify a job number before proceeding. Note: The default job number that displays is the last job number
entered in this field during the current session. If you are accessing this
screen for the first time during a session, this field defaults to blank. |
Include rates detail? |
Select to include the rate detail for each type (Dollars, Hours, and Quantity) selected for the report. |
Include |
|
Dollars? Hours? Quantity? |
Select at least one checkbox that corresponds to the data you want to display on the report. For each checkbox selected, a separate line will be included for the selection on the report. |
Report format |
|
Phase/Cost type Phase summary Group |
Select the Phase/Cost type option to include all jobs currently built from group or phase. Select the Phase summary option to include all jobs built from phase, but exclude all jobs for group summary. Select the Group option to include all jobs built from group, but exclude jobs built by Phase/cost type and Phase summary. |