T/M Processing Date Change
This screen is used to view or change the Processing date.
Fields |
Descriptions |
|---|---|
Current settings |
|
Processing date |
The left column displays the current Time + Materials processing information. The information is re-displayed on the calendar on the right. Enter the new processing date by typing over the displayed date, or click the date on the calendar. To leave the processing date as it is displayed, click the Reset button to restore the present setting. Click Cancel to exit the screen without saving the changes. If the new date is before the minimum processing date or after the maximum processing date established during the Installation procedures, the following error message displays: DATE ENTERED IS NOT WITHIN THE current MINIMUM AND MAXIMUM DATE RANGE. |
Fiscal year |
The fiscal year in which the requested date is located displays. |
Period |
The period number in which the requested date is located (number 1-13, depending on the General Ledger settings) displays. |
Period start date |
The start date of the period displays. |
Period end date |
The ending date of the period in which the requested date is located displays. |
Allowable entry range |
|
Minimum date |
The first processing date displays. No entry is allowed. This date is set by the system administrator in the screen. |
Maximum date |
The last processing date displays. No entry is allowed. This date is set by the system administrator in the screen. |