File Layout for Historical Costs ASCII Files - HCSS - Cost File Layout

For the HCSS version, the system creates an historical actual cost file that is formatted for direct import into the HCSS Heavy Bid system. Phases without a billing item will not be included.

The following is a description of which Spectrum fields will be transferred to the appropriate Heavy Bid fields:

Field

Field start/end position

HCSS

Spectrum

1

(1,20)

Activity

Phase

2

(21, 30)

Work item

Billing item

3

(31, 40)

Job

Job code

4

(41,41)

Type

A (A=actual vs. E=estimate)

5

(42, 49)

Rev date

Job completion date

6

(50, 74)

ACTV description

Phase description

7

(75, 104)

WI description

Billing item description from the A/R contract file

8

(105, 116)

Quantity

Job-to-date quantity

9

(117, 119)

Unit

Unit of measure (u/m)

10

(120, 133)

Units per hour

Calculation of quantity/hours

11

(134, 145)

Labor hours

Job-to-date hours for the labor cost type

12

(146, 157)

Labor dollars

Labor dollars

13

(158, 169)

MATL dollars

Material dollars

14

(170, 181)

EXP dollars

Construction expense dollars (overhead)

15

(182, 193)

EQP dollars

Equipment dollars

16

(194, 205)

SUB dollars

Subcontract dollars

17

(206, 280)

ACTV note

Extended phase description from the unlimited phase description