About Initializing Progress Billings
To initialize progress billings, contract items must be set up as ‘Progress’ or ‘Both’ bill types in JC Contract Items.
You must have selected one of the following options in the Initialize Option field in JB Bill Initialization:
-
P-Progress (P) Items Only
-
B-Progress (P) and Both (B) Items – Initialize (B) Items as T&M
-
X-Progress (P) and Both (B) Items – Initialize (B) Items as Progress
You must first specify whether to initialize billings by contract range or by processing group. If you initialize by processing group (defined in JB Processing Group), the system generates billings for all contracts assigned the specified processing group. If you initialize by contract range, you can initialize a single contract or a range of contracts.
You also have the option to restrict initialization by the item bill group assigned to contract items in JC Contract Items. Initialization will include only those contract items with a bill group matching the one specified here. See Related Topics below for more information on Bill Groups.
If you are initializing progress billings with T&M items (Initialize Option B), you will also need to specify a beginning/ending cost detail date and a cost detail cutoff month. These dates identify the dates/month through which cost detail will be pulled from Job Cost to include on billings. You may enter a date in one or all of these fields. If you make an entry in all fields, the detail must meet all requirements in order to be included in the invoice generating process.
If you will be using a different cutoff date for labor detail, check the Use Different Labor Cutoff Date box and then specify the labor cutoff date.
If you are using the Invoice Delivery feature and have set up recipients for the selected contract(s) in JC Contract Recipients Detail, the initialization process automatically adds the recipients to the Recipients tab in JB Progress Bills. You can then modify, add, or delete recipients as needed for each billing.