Job Summary Cost Report - Field Descriptions
Use the table below for reference when completing fields on this screen.
Fields |
Descriptions |
---|---|
Selections |
|
Job Phase Division |
Enter the job number, phase, and Division to include on this report. |
Superintendent Estimator Project manager |
Enter the superintendent, job estimator, and project manager for this job. |
Through period end date Fiscal year Period |
Enter a date to end the report with, or press Enter to accept the current Job Cost processing date. The corresponding fiscal year and period display based on the period end date. |
Summary by job? |
Select this checkbox to summarize the report with one line for every minor and major group, followed by the job total. |
Include open commitments? |
Select this checkbox to include open commitments in JTD costs. The open commitment calculation will include use tax recorded on purchase orders and job requisitions. |
Include Payroll in progress? |
If you use this feature and post Payroll burdens to separate phases, verify that the burden phases are added to the phase detail file before any pre-time cards are entered using these phases. When this checkbox is selected, Spectrum computes the total payroll cost (including burdens) that has been entered into but has not yet been calculated or posted. This cost is added to the actual cost of each job.Note: This is only an estimate and does not reflect the actual
computed costs. If the job uses actual burdens, the burden cost is estimated
using the Job Payroll Setup section. In addition, if the payroll information is changed
before the payroll is calculated and updated, the actual costs that post to
the job will be different from what is reflected on the previously printed
report. Estimated payroll costs are also included in the current week/month
on this report. |
Include A/P invoices in progress? |
Select this checkbox to include unapproved and unposted A/P invoices; otherwise, leave the checkbox clear. When this checkbox is selected, Spectrum computes the total invoice amount.This amount is added to the actual cost of each job. If the invoice information is changed before the invoice is posted or updated, the actual costs that post to the job will be different from what is reflected on the report when it was previously printed. The estimated invoice costs are also included in the current week/month on this report. |
Cost type format |
|
Expanded report format? Labor cost type(s) Subcontract cost types Cost types for column #4 Cost type(s) for column #5 |
The Expanded format includes two additional cost types (Cost types for columns #4 and #5), which can be set up in Job Cost Installation - Cost Types. You can edit the cost types once you set them up on the installation screen. If you do not select this checkbox, the cost type format will be standard, without the additional cost types. |
Report type |
|
Use projected costs Non-projected week-to-date Non-projected month-to-date Non-projected year-to-date |
Select the option corresponding to the report type you want to preview. The default is based on Job Cost Installation prompts for period type and Show projected cost. |
Week-to-date begin Week-to-date end |
Selecting the Non-projected week-to-date option above activates these fields. Enter the first and last dates you want to include on the report, or press Enter to accept the default of ALL. The Begin field default date is 6 days less than the End field default date. Press F4 to select a different date or click the Date Calculator to automatically change the calculation method. |
Group summary |
|
Phase summary Phase summary with subtotals Through minor group Minor group with subtotals Major group only Totals by job |
Select to preview the report with one of these options. Major and minor group descriptions are set up in Job Phases. The category-specific group description will display if a category has been designated in Jobs and the category-specific code is present. The 'Totals by job' version of the report explains the amount of costs remaining in the WIP Report. |
Phase Variance |
|
All phases Over variance only Under variance only |
You can select an option for the variance based on over or under, and based on a percent or a specific dollar amount. This allows a project manager to see only those phases that are over or under budget, without viewing all phases on a job. Under variance is computed for less than or equal to the variance selected. The Variance % and Variance amount fields become available if you select either the Over or Under variance only option. |
Variance % Variance amount |
Enter the variance percent and amount to include on the report. |
Job status |
|
Active Inactive Complete |
Select at least one Job status to include on the report. |