Standard Phase File Maintenance
Use this screen to establish relationships between phase codes used in your estimating package and those used by Spectrum.
If the phase codes used in your estimating software do not correspond to the phase codes set up in Spectrum, use this screen to assign a correlation between the two different numbering systems.
Use the New, Edit, View, and Delete buttons to add or edit import phases (field descriptions for the New/Edit Standard Phase window are provided in the table below).
Example:
If a company with an Import phase code of 123456 wants to assign this phase code to Spectrum phase code 789 when importing the phase to Project Setup using a text file, enter 789 in the Phase code field on this screen. As a result, the phase will be 789 regardless of the job phase setup or the Job Cost Installation settings for leading and trailing zeros.