JB Progress Billing Form
Use this form to enter or adjust billing amounts on a contract.
You can set up billings manually or automatically (by initialization). To initialize billings, select
. When you initialize a progress billing, all items on a contract with a Bill Type of 'Progress' or 'Both' are added to the billing and display on the Items tab.When entering a bill manually, much of the information on this form defaults once you specify the contract. This information includes the customer, billing address, and payment terms. As with initialization, only contract items with a Bill Type of 'Progress' or 'Both' are added to the billing. All previous values for each item are included.
Previous bill values are initialized as the sum of the Previous and This Bill amounts for the contract's last billing (the billing whose bill month/number are prior to the current bill month/number). If there are no previous billings for the contract, the previous values default as 0.00.
Viewing Bill Items Information
The Bill Items Info section (above the grid) displays Previous and This Invoice values at the Contract and Item level. As you work on an item, the system automatically updates ‘this invoice’ values for Work Complete, Stored Materials, Total, and % Complete. Stored Materials purchased for a contract item increase the Total, whereas ‘installed’ materials decrease the total. Use the chevron buttons (/
) to toggle the Bill Items Info section open and closed (respectively).
Overriding Retainage
You can override retainage amounts for each item on a billing using the Items tab or at the contract level using the JB Progress Bill Retg Totals form (accessed by selecting the Retainage Totals option from either the File menu or the Tasks drop-down). For more information, see About the JB Progress Bill Retg Totals Form.
Printing the Worksheet
After entering or editing the information on a billing, you can view and/or print the information by selecting
. The JB Contract Progress Worksheet report will appear, displaying the Previous, This Billing, Current, and Stored Materials amounts for the current contract/billing. Use this worksheet to gather current billing information for creating invoices.Bill Status Tracking
The Bill Status Tracking section allows you to assign a JB reviewer group, and then track the review and approval process for Progress billings. Once you assign a reviewer group, the Reviewers tab shows the reviewers in the specified reviewer group. The Reviewer tab is display only.
Recipients / Delivery Tracking
The Recipients and Deliver tabs are used in conjunction with the Invoice Delivery feature and provide information about the recipients and delivery history for each invoice (respectively).
Regardless of whether you initialize billings (in JB Bill Initialization) or add them manually, the Recipients tab automatically defaults the recipients you have defined for the contract in the JC Contract Recipients Detail form. You can edit the delivery information for existing recipients (delivery method, name, email or mailing address), add new recipients, or delete recipients.
The Delivery tab allows you to track the delivery history for invoices associated with the billing. This tab is display only, and shows you the delivery ID, the date the invoice was sent (delivered), delivery status (Delivered or Failed), and the recipient, as well as the recipient's email and/or address information (depending on the delivery method).
- JB Bill Initialization Form
- About Updating Previous Billed Amounts on Future Bills
- About the JB Progress Billing Change Orders Form
- About the JB Progress Item SM and Tax Form
- About the JB Miscellaneous Distributions Form
- Progress Billing Invoice Notes
- About Changing Interfaced or Closed-Month Billings
- About Closed Contract Billings