Sloping slab drainage creates a concrete slab topping and a drainage hole.
Objects created
-
Drainage hole
Use for
|
Situation |
Description |
|---|---|
|
|
Drainage holes with valley 1 and hip 2 created. |
Limitations
Slab topping does not adapt to slab chamfers. You need to define the slab chamfers and topping chamfers separately.
Before you start
Create or split the slabs so that there is one drainage point in each slab.
Selection order
-
Select the main part (slab).
-
Pick a point to create the drainage hole.
The drainage hole is created automatically when the point is picked.
Part identification key
|
Part |
|
|---|---|
| 1 |
Drainage hole |
Parameters tab
Use the Parameters tab to control the type, dimensions and properties of the drainage hole.
Drainage hole type
|
Option |
Description |
|---|---|
|
|
A drainage hole is not created. |
|
|
A rectangular drainage hole is created. |
|
|
A round drainage hole is created. |
Drainage hole dimensions
|
Option |
Description |
|---|---|
|
|
Define the side dimensions of the rectangular drainage hole. |
|
|
Define the diameter of the round drainage hole. |
Drainage hole properties
|
Option |
Description |
|---|---|
|
Define slab inclination by |
Select how the slab is inclined, by a combination of slope (S) or slope percentage (S%), and topping thicknesses (d1, d2). The Slope, d1, and d2 options are available accordingly. |
|
Slope |
Slope of the topping, for example, 0.01 (S) or 2 (S%). |
|
d1 |
Thickness of the topping at the drainage point or at the hole. |
|
d2 |
Thickness of the topping at the edge of the slab or at the hip. |
|
Create cast unit |
Select how the cast unit is created:
|
|
Material |
Define the material of the topping by selecting it from the material catalog. |
|
Type |
Select whether a valley or a hip is created. If you select Hip, you can only pick slab corners. |