Job-Specific Fees
Fees may be a flat amount or a percentage based on the total bill, the subtotal, or on individual cost types. Examples include environmental and hazardous materials fees.
You can add, edit, or delete fees as necessary. Entries in this window are originally based on defaults established in the Time + Material Installation screen.
Fields |
Descriptions |
---|---|
Line |
Line numbers are assigned and maintained by the system. Enter a description for the fee. |
Description |
|
Type |
Select the type of fee: Flat or Percent.
|
Based on |
Enter C to base the fee on individual Cost types; S to base the fee on the Subtotal of all cost types; or T to base the fee on the on the total (including any add-ons). If S or T is entered, the cursor skips to the Amount field. If C is entered, the cursor advances to the next field. |
Cost type |
Enter the cost type(s) to be included in this fee. |
Amount |
Enter the amount of the flat fee or percentage on which to base the fee. The maximum value is $99,999,999.99. |
Taxable? |
Select the checkbox if the fee is taxable. |