Create an Export File Within Timberline (PE Method)
This Project Setup module can be used to link a non-Spectrum estimating program to the Spectrum Construction Management software.
- At main menu, select PE for Produce Estimate.
- The system will prompt Create new estimate file? Enter No.
- The system will prompt Name of this estimate? Enter estimate name.
- Next, select IF for Interface Options.
- Then, select GJ for Generate Estimate to Job Cost.
- The Generate to Job Cost Options screen will appear:
- Job #: ___________ (enter the Spectrum job number)
- Transaction Date: _____________(enter the date to be associated with the transactions generated)
- Reference Number: ____________
- (enter C for Job "C"ost category to use amounts for Labor, Materials, Sub, Equipment and Other (columns) from the spreadsheet)
- Description: _____
- (enter C to use the Job Cost (C)ategory Descriptions)
- Is Estimate a Change Order?: ____ (enter No)
- Round Quantities?: ____ (enter No)
- Allocate Add Ons?: ____ (enter No)
- Generate Burden Entries: ____ (enter No)
- Optional User Field 1: _____ (enter B for Blank)
- Optional User Field 2: _____ (enter B for Blank)
- The system will prompt: "Select where to print the report."Enter F for (F)ile. If desired, you may also print the export file to a printer to review information. If printing the export file to a printer, respond No at the Change Print Style prompt. The phase descriptions may be blank on the printout but will be contained in the export file.
- The system will prompt: "Print file name?" Enter estimate name.
- The file is now ready for import by Spectrum Project Setup.