Link a Job from Vista to a ProjectSight Project
Create a job in Vista and a project in ProjectSight, then link the records.
If you delete the job in Vista, this unlinks the project in ProjectSight and removes the job from the ERP project dropdown list.
Associated fields in Vista and ProjectSight:
Vista JC Jobs Field Name | ProjectSight Project Field Name |
---|---|
Job Number | Sequence |
Description | Name |