JC Owner Job Cost

You can use the JC Owner Job Cost report by selecting Job Cost > Reports > JC Owner Job Cost.

This report reads the current and previous rate as well as the restrictions in JB Labor Rates and JB Labor Rate Overrides and also will bring in the Material and Equipment Rates. These rates are then multiplied with the Actual Hours or Actual Units to get the Costs. The Cost Column will be computed within the date range selected from the parameters, while the Previous Cost and Cost to Date columns will be calculated based on information prior to the beginning date/month and ending date/month parameters, respectively. At this time the report does not include Markups or Add-ons. The report will always show unbilled items, use parameters to show Non-billed and Billed items.

Report Parameters

Description

Company

Accept the default, or press F4 to select a company.

Beginning Job

Select the Field Lookup button or press F4 to select the beginning job.

Ending Job

Select the Field Lookup button or press F4 to select the ending job.

Beginning Phase

Select the Field Lookup button or press F4 to select the beginning phase.

Ending Phase

Select the Field Lookup button or press F4 to select the ending phase.

Labor Cost Type

Click the Field Lookup button or press F4 to select the labor cost type.

Include Company Totals?

checkbox to include company totals.

Include Zero Estimates?

checkbox to include zero estimates