You can view a summary of costs for a work order scope using the Summary tab in SM Work Orders.
The Summary tab (display only) provides a summary of costs, by cost type category and cost type, for the selected work order scope (based on work completed lines posted to the work order scope).
The following table describes the values in each grid column. Totals shown will be the sum of all work completed lines posted to the same cost type category/cost type.
Column Name | Description |
---|---|
Cost Type Category | Cost type category (L-Labor, E-Equipment, M-Material, O-Other, S-Subcontracts) |
Cost Type | SM Cost Type assigned to work completed lines. The system combines lines with the same SM Cost Type |
Description | Description of the SM cost type |
Is Taxable | Indicates whether the cost type is taxable (checkbox in SM Cost Types) |
Proj Cost | Total projected cost for the cost type. |
Actual Cost | Total actual cost, including tax (for lines that include tax). |
Act Pct of Fixed Price | Total actual cost (including tax) divided by the scope's fixed price (flat prices scopes only). For Time and Material and Non-Billable scopes, this value will be 0.00%. |
Act + Pct of Fixed Price | Total remaining committed cost + total actual cost (including tax) divided by the scope's fixed price (flat price scopes only). For Time and Material and Non-Billable scopes, this value will be 0.00%. |
Remain Proj Cost | Total projected cost minus total actual cost (including tax) |
Actual Tax Amt | Total actual cost tax |
Proj Tax Amt | Total projected tax amount |
Proj Tax Basis | Total projected tax basis |