Bill Available Material Transactions

This window will display a list of Purchase Order and Cost History material transactions to select for billing, or material transactions currently located in Invoice Approval and A/P Invoice/Credit Memo Entry to generate material billing entries.

When this window is first opened, the Selected column will be blank. The operator will be able to highlight one or more of the detail lines for transfer. The G/L department will be assigned based on the code assigned in the work order header. If the G/L department is blank, or the assigned department is a 'direct cost' department, the operator will be prompted to enter a valid G/L department before continuing with the update. If an error is made while selecting transactions to bill, click the Deselect button to remove unwanted billings. This will un-flag transactions so that they may be re-selected to bill later, if desired.

When adding a new material transaction record from P.O. or Material cost history for a work order, the current Work Order processing date will be assigned as the 'Transaction Create Date'.

Note: Regarding Lump Sum Purchase Orders, Spectrum will not pro-rate the billing amount based on cost amount if multiple receivings are done against a lump sum PO. The full billing amount of the lump sum PO line will calculate and be charged to the work order when the material line is selected in Work Order Entry. You can modify the billing amount as needed to invoice the correct total.

Field

Description

Select All

Press this button to select all of the detail lines for transfer.

Select

Click this button to mark the selected detail line for transfer.

Deselect All

Click this button to deselect all detail lines.

Deselect

Click this button to deselect a detail line.