Field Definitions: JC Change Orders Form

The following is a list of field descriptions for the JC Change Orders form. Many of the descriptions include links to other topics that provide additional information about or related to the topic.

Job

Specify the job for which you are setting up this change order. Once entered, the job’s contract and status are displayed to the right.

Note: If you enter a soft- or hard-closed job and you do not allow posting to closed jobs, you can view existing change orders, but you cannot enter new change orders.  

JC Change Orders

 

ACO

Enter the approved change order number, up to 10 characters.

 

 

JC Change Orders

Description

Enter a description of this change order, up to 60 characters.

 

 

JC Change Orders

Approved By

Enter the name or initials of the person who approved this change order. Up to 30 characters allowed.

 

 

JC Change Orders

Approval Date

Enter the date this change order was approved.

 

 

JC Change Orders

ACO Seq

Enter the sequence number that indicates the order in which this change order is to be processed. Defaults the next sequential number for the job.

The sequence number entered here will determine the amount to be included on the Approved Change Order form in the “Net change by previously authorized change orders was” line. Any change orders with a sequence number less than this one will be included on this line.

 

 

JC Change Orders

Change in Days

Display only, the total number of days by which this change order will affect the contract’s original completion date. This total is the sum of ‘change in days’ for all change order items.

If change order was interfaced from PM, this field defaults the “change in days” specified for the approved change order. If changes to this value occur due to changes made at the change order item level, this value and the modified item values will be updated to PM.

 

 

JC Change Orders

New Completion Date

Specify the new estimated date of completion. Entry here will automatically update the Projected Completion Date in the JC Contracts.

 

 

JC Change Orders

Bill Group

Enter the bill group for this change order. Although not validated, the bill group can be used to group like items together for billing purposes.

Note: Enter NB if this change order is not to be billed. This allows you to use this program for internal budget changes that do not appear on the billing.  

JC Change Orders

 

Internal/External

I = Internal change order. Use this option to identify this change order as one that will only affect the contractor’s internal budget.

E = External change order. Use this option to identify this change order as one that will affect the owner’s schedule of values.

 

 

JC Change Orders

ACO Item

Enter a number for this change order item, up to 10 characters.

 

 

JC Change Orders

Contract Item

Specify the contract item for this change order item. If you enter a contract item that does not already exist for the contract, the contract item description displays as ‘Contract Item is not on file!” and the JC Contract Item form is automatically displayed. You can then set up the new contract item as necessary (with the exception of units, unit price, and amount, which are disabled). Once you exit the JC Contract Item form,the contract item’s description and unit of measure default for the change order item.

Note: You can enter edit the units, unit price, and amount for the new contract item as necessary via the JC Contract.  

JC Change Orders

 

Description

Enter a description of this change order item, up to 60 characters. Defaults the contract item’s description.

 

 

JC Change Orders

Change in Days

Enter the change in days for this contract item. This will be the number of days by which the contract completion date has been changed by this item.

If the change order was interfaced from PM, this field defaults the “change in days” specified for the approved change order item. If this value is changed here, it will update the change order item in PM.

 

 

JC Change Orders

Month Approved

Enter the month this change order item was approved.

 

 

JC Change Orders

 

Bill Group

Enter the bill group for this change order item. Although not validated, the bill group can be used to group like items together for billing purposes.

Enter NB for non-billable items.

 

 

JC Change Orders

Units

Enabled only if UM is not ‘LS’.

Enter the number of units by which this change order item changes the contract’s total units.

 

JC Change Orders

Unit Price

Enabled only if UM is not ‘LS’ and no unit price is defined for the contract item.

Enter the unit price for this contract item. Unit price will be updated for the contract item in JC Contract Items (JCCI).

 

 

JC Change Orders

Amount

For items with a ‘LS’ unit of measure, enter the total amount by which this change order item changes the contract’s total dollars.

For items with a UM other than ‘LS’, amount defaults based on the specified units x unit price. You can override this amount if necessary; however, because units are not recalculated, this may cause the contract amount to not be equal to the units x unit price. In addition, you will receive a message warning you that Job Billing will display only the original unit price.

Note: Amount entered here will update the contract’s Current amount.  

JC Change Orders

 

Phase

Enter the phase this change order item affects. The phase description displays to the right of this field.

What happens if you select a phase not on the job

You may specify a phase not already on the job, even if this job’s phases are locked. Because you are adding estimated costs rather than actual costs, this program works somewhat like the Job Estimates program in that it overrides the normal rules for locked jobs and allows you to add new phases even if the job's phases are locked. The new phases will be cross-referenced to the contract item for the change order item.

 

 

JC Change Orders

Cost Type

Specify a cost type for this phase. Cost type must be set up for the phase in JC Phases or JC Job Phases.

 

 

JC Change Orders

Phase Description

Enter the phase description, up to 30 characters. Initially defaults the description defined for this phase in JC Phases or JC Job Phases.

 

JC Change Orders

Ins Code

For existing job phases, this field is disabled and displays the insurance code assigned to the phase in JC Job Phases or blank, if no insurance code assigned in JC Job Phases.

For new phases, enter the insurance code (from HQ Insurance Codes) that applies to this phase, if applicable. Once record is saved, phase and insurance code will be updated to JC Job Phases (applies to ‘locked phases’ jobs as well).

 

 

JC Change Orders

Month

Specify the month this change order was added to the contract.

 

 

JC Change Orders

U/M

Enter the unit of measure for the phase. Defaults the unit of measure defined for the phase in JC Phases or JC Job Phases.

 

 

JC Change Orders

Est Hours

Enabled only if tracking hours for the specified cost type.

Specify the estimated number of hours needed to complete this phase on the change order item.

 

 

JC Change Orders

Estimated Units

Enabled only if unit of measure is not ‘LS’.

Specify the estimated number of units needed to complete this phase on the change order item.

 

JC Change Orders

Unit Cost

Enabled only if unit of measure is not ‘LS’.

Specify the unit cost for this phase on this change order item.

 

 

JC Change Orders

Est Cost

Specify the estimated cost for this change order item. For non-LS cost types, defaults an amount based on the estimated units x unit cost. This amount will be the estimated cost of this phase on this change order item.

 

 