PC Win / Loss Bid Activity

You can use the PC Win / Loss Bid Activity report to get a picture of the activity within the estimating department and track performance at several levels (listing data from the PC Potential Projects form). To access this report, select Pre-Construction > Reports > PC Win / Loss Bid Activity.

The report is grouped by project type and department; each group includes bid price, bid gross profit, and the markup percent, as well as other information. Each group also contains a sub report showing the same data, but grouped by bid result. The data for all projects and departments are summarized at the end of the report.

Report Parameters

Description

Company

Accept the default, or press F4 to select a company.

Department

Click the Field Lookup button or press F4 to select the department or leave blank for all.

Beginning Bid Date

Enter beginning bid or leave blank for all.

Ending Bid Date

Enter ending bid or leave blank for all.

Bid Status

Click the Field Lookup button or press F4 to select the bid status or leave blank for all.

Bid Result

Click the Field Lookup button or press F4 to select the bid result or leave blank for all.

Project Type

Click the Field Lookup button or press F4 to select the project type or leave blank for all.

(P)rime or (S)ub (Blank for Both)

Enter P or S or leave blank for all.