Companywide Rates Screen Field Reference
This screen field reference describes the following:
Deduction tab
Use the Deduction tab to set up companywide rates for deductions. Use the Deductions screen to add your deductions to ProContractor.
Field | Description |
---|---|
Deduction grid - Each row in the grid is a deduction with a companywide rate. Click | |
Deduction | Enter the code of the Deductions screen for which you want to create a companywide rate or click |
Name | Displays the name of the deduction. |
Use This Rate for | Click
|
Effective Date | Enter the effective date of the companywide rate for deduction or click |
End Date | Enter the end date of the companywide rate for deduction or click Note: If this field is blank, the deduction will not calculate.
Therefore, if there is no end date, leave the default end date value of
12/31/9998. |
Calculation section - Use this section to set rules for how ProContractor will calculate the deduction. This section displays information for the deduction selected in the Deduction grid. | |
Calculation Method | Enter the code of the calculation method for the deduction or click |
Calculation Sequence | Enter the sequence number of the deduction. ProContractor will calculate deductions in sequence based on this value. |
Rate or Amount | Enter the rate or amount of the deduction based on the calculation method. You can enter the rate as a percentage with up to five places. |
Threshold section - Use these settings to indicate the threshold at which to begin calculating the deduction. | |
On | Click
|
Method | Click
|
Amount | Enter the minimum amount of the deduction in the period specified in the Method field. Once this amount is reached, ProContractor will calculate the deduction. |
Limit section - Use these settings to indicate the limit when calculating the deduction. | |
On | Click
|
Method | Click
|
Amount or Balance | Enter the maximum amount of the deduction in the period specified in the Method field. Once this limit is reached, ProContractor won't calculate the deduction. |
Monthly Frequency to Calculate section - Use this section to indicate when ProContractor will calculate the deduction. This section displays information for the deduction selected in the Deduction grid. | |
First Week | Click |
Second Week | Click |
Third Week | Click |
Fourth Week | Click |
Fifth Week | Click |
Remittance Control section - This section displays information for the deduction selected in the Deduction grid. | |
Withheld Subaccount | If the general ledger account for the deduction uses subaccounts, enter the Chart of Accounts screen for the deduction or click Note: ProContractor validates the subaccount entered when you save
a manually entered employee time card, manually adjust a payroll check,
or run Calculate Taxes and Deductions. If the subaccount does not exist
at that time, the process will not complete. |
Fringe Benefit tab
Use the Fringe Benefit tab to set up companywide rates for fringe benefits. Use the Fringe Benefits screen to add your fringe benefits to ProContractor.
Field | Description |
---|---|
Fringe grid - Each row in the grid is a fringe benefit with a companywide rate. Click | |
Fringe | Enter the code of the Fringe Benefits screen for which you want to create a companywide rate or click |
Name | Displays the name of the fringe benefit. |
Use This Rate for | Click
|
Effective Date | Enter the effective date of the companywide rate for fringe benefit or click |
End Date | Enter the end date of the companywide rate for fringe benefit or click |
Calculation section - Use this section to set rules for how ProContractor will calculate the fringe benefit. This section displays information for the fringe benefit selected in the Fringe grid. | |
Calculation Method | Enter the code of the calculation method for the fringe benefit or click |
Calculation Sequence | Enter the sequence number of the fringe benefit. ProContractor will calculate fringe benefits in sequence based on this value. |
Rate or Amount | Enter the rate or amount of the fringe benefit based on the calculation method. You can enter the rate as a percentage with up to five places. |
Bona Fide Prevailing Wage Fringe | Click |
Threshold section - Use these settings to indicate the threshold at which to begin calculating the fringe benefit. | |
On | Click
|
Method | Click
|
Amount | Enter the minimum amount of the fringe benefit in the period specified in the Method field. Once this amount is reached, ProContractor will calculate the fringe benefit. |
Limit section - Use these settings to indicate the limit when calculating the fringe benefit. | |
On | Click
|
Method | Click
|
Amount or Balance | Enter the maximum amount of the fringe benefit in the period specified in the Method field. Once this limit is reached, ProContractor won't calculate the fringe benefit. |
Monthly Frequency to Calculate section - Use this section to indicate when ProContractor will calculate the fringe benefit. This section displays information for the fringe benefit selected in the Fringe grid. | |
First Week | Click |
Second Week | Click |
Third Week | Click |
Fourth Week | Click |
Fifth Week | Click |
Remittance Control section - This section displays information for the fringe benefit selected in the Fringe grid. | |
Accrual Subaccount | If the general ledger account for the fringe benefit uses subaccounts, enter the subaccount for the fringe benefit accrual or click Note: ProContractor validates the subaccount entered when you save
a manually entered employee time card, manually adjust a payroll check,
or run Calculate Taxes and Deductions. If the subaccount does not exist
at that time, the process will not complete. |
Expense Subaccount | If the general ledger account for the employee fringe benefits payroll cost account, set on Payroll Cost Account screen, uses subaccounts, enter the subaccount for the fringe benefit expenses or click Note: ProContractor validates the subaccount entered when you save
a manually entered employee time card, manually adjust a payroll check,
or run Calculate Taxes and Deductions. If the subaccount does not exist
at that time, the process will not complete. |
Additional Pay tab
Use the Additional Pay tab to set up companywide rates for additional pays. Use the Additional Pay screen to add your additional pays to ProContractor.
Field | Description |
---|---|
Additional Pay grid - Each row in the grid is an additional pay with a companywide rate. Click | |
Additional Pay | Enter the code of the Additional Pay screen for which you want to create a companywide rate or click |
Name | Displays the name of the additional pay. |
Use This Rate for | Click
|
Effective Date | Enter the effective date of the companywide rate for additional pay or click |
End Date | Enter the end date of the companywide rate for additional pay or click |
Calculation section - Use this section to set rules for how ProContractor will calculate the additional pay. This section displays information for the additional pay selected in the Additional Pay grid. | |
Calculation Method | Enter the code of the calculation method for the additional pay or click |
Calculation Sequence | Enter the sequence number of the additional pay. ProContractor will calculate additional pays in sequence based on this value. |
Rate or Amount | Enter the rate or amount of the additional pay based on the calculation method. You can enter the rate as a percentage with up to five places. |
Threshold section - Use these settings to indicate the threshold at which to begin calculating the additional pay. | |
On | Click
|
Method | Click
|
Amount | Enter the minimum amount of the additional pay in the period specified in the Method field. Once this amount is reached, ProContractor will calculate the additional pay. |
Limit section - Use these settings to indicate the limit when calculating the additional pay. | |
On | Click
|
Method | Click
|
Amount or Balance | Enter the maximum amount of the additional pay in the period specified in the Method field. Once this limit is reached, ProContractor won't calculate the additional pay. |
Monthly Frequency to Calculate section - Use this section to indicate when ProContractor will calculate the additional pay. This section displays information for the additional pay selected in the Additional Pay grid. | |
First Week | Click |
Second Week | Click |
Third Week | Click |
Fourth Week | Click |
Fifth Week | Click |